Facility Evaluation and 10 Year Capital Plan
Developed a 10 year facility capital master plan to investigate the cause and mitigate the effects of stormwater/drainage issues, as well as other required architectural and engineering concerns at their complex in Bayside. Evaluated facility and site conditions and produced detailed report on structuring mitigation. Prepared 10 year preventive maintenance plan along with budget breakdowns.